Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home1/diywmcom/public_html/baifaqimei/wp-includes/functions.php on line 6114

Deprecated: Creation of dynamic property Kirki\Field\Repeater::$compiler is deprecated in /home1/diywmcom/public_html/baifaqimei/wp-content/themes/blogstream/functions/kirki/kirki-packages/compatibility/src/Field.php on line 305
台湾地震影响范围及临时解决办法 – 白发齐眉 Notice: 函数 WP_Object_Cache::add 的调用方法不正确。 缓存键不能为空字符串。 请查阅调试 WordPress来获取更多信息。 (这个消息是在 6.1.0 版本添加的。) in /home1/diywmcom/public_html/baifaqimei/wp-includes/functions.php on line 6114

Notice: 函数 WP_Object_Cache::add 的调用方法不正确。 缓存键不能为空字符串。 请查阅调试 WordPress来获取更多信息。 (这个消息是在 6.1.0 版本添加的。) in /home1/diywmcom/public_html/baifaqimei/wp-includes/functions.php on line 6114
class="post-template-default single single-post postid-61 single-format-standard col-2cl full-width invert-dark-logo logged-out">

台湾地震影响范围及临时解决办法


海底通信光缆中断情况
1. 中美 海缆于12月26日20:25 距离台湾枋山登陆站 9.7公里左右发生中断;
2. 亚欧三号海缆于12月26日20:25 距离台湾枋山登陆站 9.7公里左右发生中断;
3. 亚太二号海缆S7于12月27日00:06距离台湾淡水登陆站904公里左右发生中断;
4. 亚太二号海缆S3于12月27日02:00距离崇明登陆站2100公里左右(靠近台湾处)发生中断;
5. Flag光缆亚太系统于12月26日20:43在韩国到香港段中断;
6. Flag光缆亚欧段于12月27日04:56在香港到上海段中断。


中美光缆系统结构示意图
[b]影响范围
[/b]
以上情况致使不仅中国大陆到北美、台湾等方向的互联网电路大量中断,中国大陆至台湾地区、美国、欧洲等方向国际港澳台通信线路受此影响亦大量中断,国际港澳台互联网访问质量受到严重影响,国际港澳台话音和专线业务也受到一定影响。日本、韩国、新加坡网民也受到一定影响。
AMD、微软、NVIDIA等美国加拿大网站几乎无一能够访问,部分欧洲网站能够访问,日本韩国网站所受影响不大。
通讯工具MSN、SKYPE、Yahoo通等服务器在美国的软件也纷纷落马。
临时解决办法
由于此次光缆中断对韩国日本影响相对较小,所以我们可以通过韩国日本代理服务器来达到登陆MSN或访问国外网站的目的,以下是笔者搜集回来的一些代理服务器地址,有需要的朋友可以尝试一下。
(附代理服务器设置方法:打开IE:菜单选项上的“工具”->Internet选项->连接->局域网设置->为LAN使用代理服务器->高级->对所有协议均使用相同的代理服务器)
注意:以下地址并未全部经过验证,如碰到不能使用的请自行更换尝试。
80.227.0.156:80
125.244.152.2:8080
201.34.204.86:3128
81.10.104.230:3128
200.193.52.7:8080
61.233.18.116:3128
88.191.39.214:80
203.110.192.148:8080
80.227.0.153:80
59.154.11.30:8080
121.1.6.130:8080
88.191.39.213:80
213.42.21.22:80
200.180.215.131:3128
195.175.37.70:8080
200.167.230.39:3128
194.170.187.5:80
148.233.229.236:3128
200.88.223.99:80
62.150.40.142:80
212.138.64.145:80
58.71.13.28:3128
212.138.64.147:80
220.227.168.51:80
165.228.128.10:3128
200.174.85.195:3128
61.17.188.124:8080
219.232.9.181:80
58.147.4.19:8080
212.138.64.149:80
203.150.114.54:8080
202.108.119.227:80
59.10.72.198:8080
203.121.68.198:8080
195.229.236.70:80
148.233.159.58:3128
221.231.139.168:8080
165.228.131.12:80
192.76.71.99:80
200.171.124.197:3128
84.16.240.239:3128
200.142.126.126:3128
200.183.137.66:3128
200.91.243.90:3128
200.189.88.11:80
80.80.12.124:80
200.105.208.66:3128
66.11.50.66:80
220.60.16.180:8080
82.137.247.131:8080
83.223.130.18:8080
59.41.253.35:80
203.129.237.164:8080
72.32.79.253:80
58.147.4.20:8080
165.228.132.11:80
218.216.213.77:8080
203.146.217.66:3128
62.150.130.26:80
203.144.160.242:80
203.113.130.59:80
195.175.37.6:8080
165.228.132.10:3128
212.138.64.150:80
61.34.11.205:80
62.150.35.230:80
200.88.46.58:80
211.159.16.7:80
66.121.102.54:8080
195.226.230.58:80
195.175.37.8:8080
210.212.95.99:8080
210.22.14.61:3128
202.143.152.150:8080
200.69.147.117:3128
148.233.229.235:3128
165.228.129.10:3128
61.55.135.167:8080
202.29.20.151:8080
212.138.64.142:80
64.34.113.120:80
66.98.238.8:3128
195.175.37.71:8080
212.138.64.144:80
213.63.185.22:3128
148.233.159.24:3128
217.219.120.26:3128
80.80.12.125:80
218.28.152.132:80
212.138.64.146:80
212.138.64.141:80
212.138.64.148:80
80.58.205.61:80
196.29.212.66:80
222.231.50.97:80
163.27.226.129:3128
200.148.158.129:3128
88.225.86.172:80
222.231.50.97:80
125.244.210.142:8080
125.244.210.140:8080
125.243.249.194:8080
(注意:以上代理服务器部分地址来自Itfront.com.cn,感谢原文作者)。



修复
国际海缆的修复,需要专用海缆工作船前往,耗时两到三周。 此前中国电信方面称,受余震影响,抢修工作遇到较大困难,加之海缆施工有一定难度,预计影响还将持续一段时间。
目前,网通和电信都虽然表示要尽快抢修,但业内专家对修复工作并不乐观,“这次地震的影响太大了,即便没有余震发生,崇明岛上修复电缆的船只也还没有开出”。
据该人士介绍,修复工作首先由中美两国工程师在两地进行光测试,根据光返回的情况分析断点的数量,以及计算出断点的位置,然后分别派出船只进行维修。按照正常的情况,修复最少要花一个月以上的时间。
历史数据:2001年2月9日,跨太平洋的中美海底光缆在上海崇明岛段受损中断,2月22日维修完成,耗时13天。
3月9日,刚刚修复的中美海底电缆在另一处发生断裂,3月22日维修完成。耗时13天